RADSBDock & Structural

Worksheets, checklists, and field references.

The tools we use internally, shared so facility teams can plan better before a contractor ever walks the site. Request any document by email — we'll send a clean PDF.

Worksheet

Dock Leveler Sizing Worksheet

A two-page worksheet for capturing trailer mix, service range, and lip length before you spec a leveler.

Request by email
Checklist

Mezzanine Pre-Design Checklist

Live load, column grid, sprinkler coverage, egress — the questions worth answering before drawings start.

Request by email
Reference

Cal/OSHA Guardrail Field Reference

The standard distilled into the field details that pass a walk-through.

Request by email
Template

Preventive Maintenance Schedule Template

Quarterly PM cadence for high-cycle dock equipment.

Request by email
Sample

Sample COI & Additional Insured Endorsement

An example of the insurance package we issue before mobilization.

Request by email
Reference

Project Binder Table of Contents

What's in the digital handover binder at project close.

Request by email

Ready to scope a project?

Talk to a project lead this week.

Tell us about your facility and timeline. We'll review the site, line up the engineering, and come back with a clear, line-itemed proposal.